CONSYSM 3450
Estimating
4 cr
Reading and interpretation of construction drawings and specifications for construction projects. Estimating the material requirements and costs of building construction projects using commercially available estimating tools. Prereq: 2240, 2241, 2310, 2345, and Physics 1200 or 1250. Prereq or concur: ConSysM 2440.
Grade history
532 students across 2 instructors · course avg 2.96
330 students · 10 terms
330 students total · 10 terms · click to see per-term
Instructor unknown
2.63 GPAmedian 3.0202 students · 5 terms
202 students total · 5 terms · click to see per-term
Source: historical OSU grade releases via thegradeguide.com (Adam Gluck), Spring 2016 – Summer 2023. FERPA-filtered: sections under 10 students excluded.
Sections
4
Instructors
1
Enrolled
268 / 144
Open
4
Instructors
Sections in Autumn 2026
| # | Sec | Instructor | Hist. GPA | Days/Time | Room | Enrollment |
|---|---|---|---|---|---|---|
| 30846 | 0010 | Philip Sutton | 3.16 GPA | MW 8:00 am-9:20 am | AE 100 100 | Open · 67/72+4 wl |
| 30847 | 0020 | Philip Sutton | 3.16 GPA | R 9:10 am-11:00 am | AE 148 148 | Open · 67/24+4 wl |
| 30848 | 0030 | Philip Sutton | 3.16 GPA | R 11:30 am-1:20 pm | AE 148 148 | Open · 67/24+4 wl |
| 30849 | 0040 | Philip Sutton | 3.16 GPA | R 1:50 pm-3:40 pm | AE 148 148 | Open · 67/24+4 wl |