CONSYSM 4660
Heavy Constr Mgt
3 cr
Methods, materials, equipment, and planning of heavy construction projects. Economics of equipment acquisition and operation. Equipment selection, performance characteristics, and production rates. Prereq or concur: 3451.
Grade history
539 students across 2 instructors · course avg 3.25
341 students · 10 terms
341 students total · 10 terms · click to see per-term
Instructor unknown
3.11 GPAmedian 3.0198 students · 5 terms
198 students total · 5 terms · click to see per-term
Source: historical OSU grade releases via thegradeguide.com (Adam Gluck), Spring 2016 – Summer 2023. FERPA-filtered: sections under 10 students excluded.
Sections
1
Instructors
1
Enrolled
33 / 50
Open
1
Instructors
Sections in Autumn 2026
| # | Sec | Instructor | Hist. GPA | Days/Time | Room | Enrollment |
|---|---|---|---|---|---|---|
| 30861 | 0010 | Philip Sutton | 3.33 GPA | MW 12:45 pm-2:05 pm | AE 104 104 | Open · 33/50 |